Certified Epoxy Flooring — Ghaziabad

Epoxy Flooring in Ghaziabad
Chemical & Impact Resistant Coatings

Industrial epoxy floor coatings for metal works, chemical plants, and garages in Ghaziabad. Heavy impact resistance, oil & solvent proof. Call 90057 20282.

₹45+per sq.ft. rates
100%dust-free & seamless
15+ Yrsaverage lifespan
FDA/GMPcertified materials

Modern Flooring for Ghaziabad

Ghaziabad is a key industrial city in Uttar Pradesh, known for steel fabrication, chemical manufacturing, and heavy engineering works. Floor surfaces in Ghaziabad face continuous exposure to oils, acids, solvents, and heavy drop impacts. Unihox installs high-strength chemical-resistant epoxy screeds and anti-corrosive floor coatings.

Heavy-Duty Flooring Issues in Ghaziabad Industries

Traditional floors (tiles, mosaic, or standard concrete) suffer from multiple failures under intense heat, dust, and heavy usage.

Chemical Corrosion & Oil Leaks

Steel mills and manufacturing workshops leak hydraulic oil, coolant, and acids which dissolve concrete matrix over time.

Severe Impact Fractures

Heavy iron parts, rods, and gears dropped onto floors fracture tiles and cause concrete craters.

Epoxy Flooring vs Traditional Tiles & Concrete

See why high-performance seamless epoxy flooring outperforms traditional floor types in long-term cost and safety.

FeatureEpoxy FlooringTraditional TilesRaw ConcreteWinner
Durability & StrengthVery High (Resists heavy impacts & cracks)Medium (Chips/cracks under heavy load)Low to Medium (Develops dusty cracks)Epoxy
Seamless & Hygiene100% Seamless (No joints, bacteria-free)Joints/Grout lines trap dirty grimePorous surface traps oil & dustEpoxy
Dust ControlCompletely Dust-Free (Non-porous)Medium (Grout accumulates dirt)High (Continuously sheds concrete dust)Epoxy
Chemical ResistanceExcellent (Resists oil, acids, chemicals)Average (Stains grout & slips)Poor (Absorbs spills permanently)Epoxy
Aesthetic OptionsHigh (Metallic, 3D, Solid Colors, Flakes)High (Multiple designs available)Very Low (Plain gray and rough)Tie
Initial CostModerate to High (Depends on Thickness)Lower to MediumLowest (Basic raw option)Tiles / Concrete
Long-term CostVery Low (Lasts 10-20 yrs, no re-laying)High (Frequent repair, grout cleaning)High (Constant repairs, dust painting)Epoxy
Installation SpeedFast (3 to 7 Days for complete cure)Slower (Tiles cutting, cement setting)Very Slow (Concrete needs 28-day cure)Epoxy
Safety & Anti-SlipHigh (Can be customized with additives)Very Slippery (When wet, dangerous)Average (High friction, but dusty)Epoxy

Epoxy Flooring Cost guide — 2026 Price List

Select a coating type to view pricing, specifications, and what is included in the package.

Basic Epoxy Roller Coating

Ideal for: Garages, small warehouses, commercial stores
Thickness: 0.5mm - 1mm (2 coats)
₹50 – ₹70 per sq.ft.
Material + Labor
What is Included:
  • Industrial grade thin-film epoxy coating
  • Dual coat system (primer + top color)
  • 100% dustproof and liquid resistant
  • Prevents concrete shedding and minor cracks
  • Light traffic ready in 24 hours
Description & Application

A highly cost-effective option for spaces in Ghaziabad that need basic protection from concrete dusting, moisture absorption, and minor oil drips. Perfect for residential garages, utility rooms, and light-traffic commercial facilities.

• Industrial Compliance: FDA & GMP Supported
• Durability Class: Heavy Commercial / Industrial Grade
• Service Warranty: 1 Year Application Guarantee
Get Free Site Assessment →or call 9005720282

Best Applications in Ghaziabad

Epoxy flooring is versatile and can be formulated for different architectural, industrial, and load-bearing requirements.

Engineering Workshops

Anti-impact quartz-reinforced epoxy floor systems designed for heavy metallic components.

Chemical Processing Units

Novolac epoxy coatings designed specifically to resist highly corrosive acids and hot chemical washdowns.

Professional Installation Process — 5-Stage Quality Protocol

We ensure flawless chemical bonding with our rigorous preparation and layering standards.

1
Day 1

Surface Preparation (Grinding & Repairing)

We use professional diamond grinders to clean, roughen, and open the pores of the concrete. Existing cracks, holes, and oil stains are thoroughly repaired.

2
Day 2

Primer Undercoat Application

A high-penetrating epoxy primer is applied to seal the base concrete and ensure a permanent chemical bond with the top coats.

3
Day 3–4

Body Coat & Build-up

Application of the main self-leveling epoxy resin layer, screed build-up, or decorative flakes/metallic pigments depending on the selected plan.

4
Day 5

Final Top Coat & Anti-Slip Additives

A clear, UV-resistant protective top coat is applied. Optional anti-slip quartz or particles are added to guarantee safety in wet conditions.

5
Day 6–7

Curing & Handover

The floor cures to full mechanical strength. Light foot traffic can start after 24 hours, and heavy machinery/vehicles after 5 days.

What Customers Say in Ghaziabad

Trusted by manufacturing plants, showrooms, and local homeowners alike.

Our machine shop floor was pitted and full of oil stains. Unihox ground down the concrete and applied a heavy-duty chemical-resistant epoxy floor. Now it looks clean and handles our heavy drills.

Harpreet Singh
📍 Loni Industrial Area, Ghaziabad

Frequently Asked Questions (FAQ)

Get answers to standard curing times, slip safety, and preparation.

Yes. For high-temperature and chemical exposure, we recommend Novolac epoxy or polyurethane concrete screeds which handle temperatures up to 120°C.

Schedule Factory Site Audit in Ghaziabad

Ensure your workspace complies with occupational health and safety standards with durable, seamless epoxy floors.

📞 9005720282
Location: Kavi Nagar Industrial Area, Ghaziabad, UP 201002
📞